Specification
Horizontal PVD coating machines are custom-engineered around your part dimensions, daily throughput, and deposition method (thermal evaporation or magnetron sputtering). The table below outlines our standard industrial horizontal build in Yuyao.
| Item | Typical Configuration | Notes |
|---|---|---|
| Chamber Architecture | Horizontal cylindrical front-loading vessel with internal floor rails | Supports wheeled planetary trolleys for rapid batch loading and unloading. |
| Chamber Dimensions | Diameters from Ø1,000 mm to Ø2,200 mm; lengths from 1,200 mm to 3,000 mm | Sized to match your spray-booth or production line jig dimensions. |
| Workflow Layout | Single trolley or dual interchangeable trolleys for non-stop cycling | Dual trolleys eliminate loading idle time between consecutive vacuum runs. |
| Deposition Sources | Resistance thermal evaporation boats / filaments or DC/MF magnetron cathodes | Configured for bright mirror aluminium, chrome-replacement, or functional films. |
| Pumping Train | Rotary piston/vane pump + Roots booster + high-speed oil diffusion pump | High pumping conductance handles heavy water-vapour outgassing from plastics. |
| Water-Vapour Trap | Cryogenic Meissner trap (-120 °C) for rapid removal of moisture outgassing | Cuts pump-down time by 40%–50% when processing hygroscopic plastics or glass. |
| Ultimate Vacuum | Typically better than 3 x 10⁻³ Pa in a clean, dry chamber | Ensures high film purity and excellent adhesion on substrates. |
| Plasma Pre-Treatment | High-voltage glow-discharge electrode bar or linear ion source | Cleans surface volatiles and activates polymer or glass substrates before coating. |
| In-Situ Topcoat Unit | HMDSO monomer dosing line + RF/pulsed-DC plasma polymerization | Deposits a protective transparent SiOₓCᵧH₂ barrier right after metallizing. |
| Planetary Fixtures | Wheeled trolleys with 6 to 12 planetary spindles (revolution + self-rotation) | Spindle length and end fittings can match existing spray-line jigs. |
| Cycle Time | 10 to 20 minutes per batch (evaporation); 25 to 45 minutes (sputtering) | High throughput for cosmetic packaging, automotive reflectors, and trim. |
| Control System | PLC with touchscreen HMI, automatic pump sequencing, and recipe storage | Interlocks protect diffusion pumps and power supplies from accidental errors. |
| Utilities | 3-phase 380 V 50 Hz, chilled cooling water loop, and compressed air | Electrical and utility specifications can be adapted to regional standards. |
| Warranty & Support | 12-month free warranty on complete equipment; long-term spare parts supply | Includes onsite installation, operator training, and lifelong engineering backing. |
Send us your part dimensions, substrate resin, and hourly target output. Our engineers will calculate chamber length, trolley configuration, and pumping speed before confirming specifications.
Application
Horizontal PVD coating machines are engineered for high-volume manufacturing lines where ease of loading and rapid batch turnaround are paramount. Key applications include:
-
Automotive lighting reflectors and bezels. BMC, PC, and PBT headlamp reflectors and fog-light housings coated with bright specular aluminium and protected with in-situ HMDSO topcoats.
-
Cosmetic packaging and luxury containers. ABS, PP, and PETG lipstick tubes, cream jars, and perfume caps receiving brilliant silver, gold, and metallic gradient finishes.
-
Appliance trims and decorative emblems. Refrigerator handles, washing-machine dials, and brand badges replacing hexavalent chromium electroplating with clean PVD.
-
Glassware, lighting bulbs, and crystal. Perfume bottles, decorative glass shades, and LED reflector cups coated with uniform 360-degree metallic layers.
-
Toys, footwear heels, and promotional items. High-density batch loading of injection-moulded ABS parts for rapid, low-cost decorative finishing.
-
Aerospace and industrial components. Large or bulky metal components requiring robust horizontal fixture support and reliable high-vacuum processing.
In high-output cosmetic and automotive lighting plants, the horizontal layout integrates smoothly with paint and UV-curing conveyor lines. Operators can transfer wheeled planetary racks directly from the UV coating line onto the chamber floor rails without double-handling parts.
The dual-trolley option further maximizes productivity: while Cart A is undergoing pump-down and coating inside the chamber, operators load Cart B on the shop floor, ensuring the vacuum vessel spends virtually 100% of its time coating rather than sitting idle during loading.
Send our Yuyao engineering team your component drawings and production targets—we will recommend the optimal horizontal chamber diameter and trolley design.
Advantage
Horizontal PVD systems offer distinct ergonomic and throughput advantages for heavy parts, bulky reflectors, and high-volume plastic metallizing. Manufacturers choose Danko horizontal coaters for several key reasons:
-
Effortless floor-rail trolley loading. Wheeled planetary carts roll smoothly in and out of the horizontal vessel, eliminating the strain of lifting heavy jigs into top-loading or vertical chambers.
-
Non-stop dual-trolley workflow. Optional dual interchangeable trolleys allow operators to prep Cart B while Cart A is coating, keeping vacuum utilization near 90%–95%.
-
Optimized for bulky and heavy parts. Horizontal vessel geometry easily accommodates long reflector bars, large automotive components, and heavy industrial fixtures.
-
Fast cycle times with Polycold traps. Large diffusion pump sets combined with cryogenic Meissner traps quickly overcome plastic outgassing for rapid 10–20 minute cycles.
-
Integrated glow clean and HMDSO topcoat. Built-in plasma pre-treatment and protective topcoating execute automatically inside the same recipe without extra material handling.
-
Robust manufacturer engineering. Fabricated in-house by Ningbo Danko's 90-person technical team with heavy-duty structural steel and reliable PLC automation.
-
12-month warranty & lifelong support. Backed by a free 12-month complete equipment warranty, onsite commissioning, operator training, and long-term spare parts supply.
Maintenance is simplified through removable stainless steel inner wall liners that catch aluminium overspray, allowing technicians to swap in clean liners during scheduled breaks rather than scraping the chamber walls.
Safety interlocks protect against cooling water interruption, compressed air failure, or vacuum seal leaks, ensuring secure, multi-shift factory operation.
When comparing horizontal PVD quotes, verify diffusion pump throughput, trolley wheel bearing durability, and Polycold coil surface area to ensure true industrial build quality.

Email:
Tel:+86-13486478562
Language
Español
Português











Tel: +86-13486478562
FAX: +86-574-62496601
Email:
Address: No. 79 West Jinniu Road, Yuyao, Ningbo City, Zhejiang Provice, China